January – February 2021: tower crane dismantled
The façade of the centre begins to take shape as brickwork commences, while poor weather dampens progress on the roof. Inside, key equipment is installed in the lower basement and internal walls are added across all other levels. The tower crane that was erected in April – filling the local skyline for almost a year – is taken down.